NANJING INTERNATIONAL
 
 
NANJING INTERNATIONAL
Home   |   Nanjing Today   |   Government    |   Life   |   Business   |   Community   |   Nanjing Q & A
NANJING INTERNATIONAL

Expenses for urban engineering facilities

Gas
Current gas charging standard: (Unit: RMB yuan)

User category

Price (yuan/cu.m)

Civilian use

0.95

Industrial use

1.05

Group and institution

1.45

Operation

1.45

School

0.95

Tap water
Current water price standard: (Unit: RMB yuan)

Pricing category

Price (yuan/cu.m)

For living purpose

1.90

Administration and institution

2.00

Industrial use

2.30

Operation and service

2.80

Special purpose

2.95

Current charging standard for tap water pipe network construction works:(Unit: RMB yuan) (from existing pipe to user water meter, including all expenses for works ?C pipeline replacement, expansion and transformation)

Pricing category

Charges for works

Newly built, expanded or modified ordinary civilian residence

26 yuan/sq.m (based on floor space)

Newly built, expanded or modified office and apartment buildings, multi-purpose buildings, guesthouses, villa and high-grade apartments

38 yuan/sq.m (based on floor space)

Industrial buildings and other users

160 yuan/T (based on nominal value of increased water flow)

Power supply
Electricity price of Jiangsu power grid:

Category

Price (yuan/kWh)

Basic price

below 1KV

1-10KV

35-110KV

110KV

220kV and above

Max. demand (yuan/kW.m)

Transformer capacity (yuan/kVA.m)

Living of urban residents

0.52

0.51

 

 

 

 

 

Commercial lighting

0.899

0.884

0.869

 

 

 

 

Other lighting

0.791

0.776

0.761

 

 

 

 

Non-industrial and general industry

0.664

0.649

0.634

 

 

 

 

Large industry

 

0.473

0.458

0.443

0.428

27

18

Including: 1. calcium carbide, electrolyzing soda, synthetic ammonia, and phosphor made with electric furnace

 

0.463

0.448

0.433

0.418

27

18

Agricultural production

0.421

0.411

0.396

 

 

 

 

Additional fee for power supply (distribution) projects??Unit: RMB yuan?
(For new users with double or multiple sources, this fee will not be charged for the circuit with the largest capacity as agreed in the contract, and other circuits will be charged at capacity agreed in the contract.)

User receiving voltage level (kV)

Fee payable by user (yuan/kVA)

Including

Fee payable for self-building a power supply project at same voltage level (yuan/kVA)

Power supply
(yuan/kVA)

Power distribution
(yuan/kVA)

0.38/0.22

270

100

170

220

10

220

120

100

160

35

170

170

 

90

110

90

90

 

 

 

 

?????
NANJING INTERNATIONAL
About | Public service | Jobs | Help | Site map | Contact
 
The Official Nanjing City Web Site
Copyright@2006 www.nj.gov.cn All Right Reserved
Technical Support:www.nanjing.gov.cn