Expenses for urban engineering facilities
Gas
Current gas charging standard: (Unit: RMB yuan)
|
User category |
Price (yuan/cu.m) |
|
Civilian use |
0.95 |
|
Industrial use |
1.05 |
|
Group and institution |
1.45 |
|
Operation |
1.45 |
|
School |
0.95 |
Tap water
Current water price standard: (Unit: RMB yuan)
|
Pricing category |
Price (yuan/cu.m) |
|
For living purpose |
1.90 |
|
Administration and institution |
2.00 |
|
Industrial use |
2.30 |
|
Operation and service |
2.80 |
|
Special purpose |
2.95 |
Current charging standard for tap water pipe network construction works:(Unit: RMB yuan) (from existing pipe to user water meter, including all expenses for works ?C pipeline replacement, expansion and transformation)
|
Pricing category |
Charges for works |
|
Newly built, expanded or modified ordinary civilian residence |
26 yuan/sq.m (based on floor space) |
|
Newly built, expanded or modified office and apartment buildings, multi-purpose buildings, guesthouses, villa and high-grade apartments |
38 yuan/sq.m (based on floor space) |
|
Industrial buildings and other users |
160 yuan/T (based on nominal value of increased water flow) |
Power supply
Electricity price of Jiangsu power grid:
|
Category |
Price (yuan/kWh) |
Basic price |
|
below 1KV |
1-10KV |
35-110KV |
110KV |
220kV and above |
Max. demand (yuan/kW.m) |
Transformer capacity (yuan/kVA.m) |
|
Living of urban residents |
0.52 |
0.51 |
|
|
|
|
|
|
Commercial lighting |
0.899 |
0.884 |
0.869 |
|
|
|
|
|
Other lighting |
0.791 |
0.776 |
0.761 |
|
|
|
|
|
Non-industrial and general industry |
0.664 |
0.649 |
0.634 |
|
|
|
|
|
Large industry |
|
0.473 |
0.458 |
0.443 |
0.428 |
27 |
18 |
|
Including: 1. calcium carbide, electrolyzing soda, synthetic ammonia, and phosphor made with electric furnace |
|
0.463 |
0.448 |
0.433 |
0.418 |
27 |
18 |
|
Agricultural production |
0.421 |
0.411 |
0.396 |
|
|
|
|
Additional fee for power supply (distribution) projects??Unit: RMB yuan?
(For new users with double or multiple sources, this fee will not be charged for the circuit with the largest capacity as agreed in the contract, and other circuits will be charged at capacity agreed in the contract.)
|
User receiving voltage level (kV) |
Fee payable by user (yuan/kVA) |
Including |
Fee payable for self-building a power supply project at same voltage level (yuan/kVA) |
|
Power supply (yuan/kVA) |
Power distribution (yuan/kVA) |
|
0.38/0.22 |
270 |
100 |
170 |
220 |
|
10 |
220 |
120 |
100 |
160 |
|
35 |
170 |
170 |
|
90 |
|
110 |
90 |